This is a one of its kind driftwood lamp finished in mineral oil. 3 meters of 3 core black fabric cable plug. (comes with bulb) It is 350mm by 250mm.

Driftwood lamp with retro Edison bulb and extra long lead.

£250.00 Regular Price
£215.00Sale Price
    ZEN WOOD DESIGN

    Woodbury - Devonshire

    MON - FRI:  7am - 7pm

    SATURDAY:   8am - 6pm

    SUNDAY:   8am - 6pm

    0